{"title":"Editions","description":"\u003ch2\u003eDiscover GEMS's limited edition print collaboration with Canadian Artists\u003c\/h2\u003e\n\u003cp\u003eGEMS limited Edition Prints showcase limited \u003cstrong\u003e\u003cem\u003efine art editions \u003c\/em\u003e\u003c\/strong\u003eby \u003cem\u003e\u003cstrong\u003eCanadian contemporary Artists\u003c\/strong\u003e\u003c\/em\u003e. Produced in small, carefully curated series, each edition is hand-signed, numbered, and certified, ensuring authenticity, provenance, and lasting value.\u003c\/p\u003e\n\u003cp\u003eFrom printmaking and etching to mixed-media experimentation, these editions reflect the diversity of contemporary \u003cem\u003e\u003cstrong\u003eCanadian art\u003c\/strong\u003e\u003c\/em\u003e. Created with craftsmanship and creative integrity, they offer collectors and enthusiasts alike a refined way to own works that embody both innovation and emotion — a bridge between tradition and modern expression.\u003c\/p\u003e\n\u003cp\u003e \u003c\/p\u003e","products":[{"product_id":"thrive-miniature-bronze-art-sculpture","title":"Thrive Miniature","description":"\u003ch2\u003e\u003cspan\u003eBronze Sculpture – Abstract Art Sculptures\u003c\/span\u003e\u003c\/h2\u003e\n\u003cp\u003eThis bronze sculpture is the result of a meticulous process that combines both traditional and modern techniques. To explore new technologies and creative avenues, the \u003cem\u003e\u003cstrong\u003eoriginal work Thrive\u003c\/strong\u003e\u003c\/em\u003e was subjected to 3D scanning, capturing every detail of the sculpture art. Using digital modeling software, the work was reproduced and adjusted in size and proportions while maintaining the integrity of the original.\u003c\/p\u003e\n\u003cp\u003eOnce the modeling was complete, a plastic shell was printed in 3D and used as a model for the final bronze casting. Through this process, the piece was transformed into a \u003cstrong\u003eunique bronze art sculpture\u003c\/strong\u003e, coated with a black patina and protected with wax. Presented on a granite base, Thrive Miniature stands as an expressive example of \u003cstrong\u003eabstract art sculptures\u003c\/strong\u003e, blending innovation with tradition.\u003c\/p\u003e\n\u003cp\u003eThis collectible piece is part of our \u003cstrong\u003eCanadian art for sale\u003c\/strong\u003e, offering discerning collectors an opportunity to acquire original art pieces that reflect both craftsmanship and contemporary vision.\u003cbr\u003e\u003c\/p\u003e","brand":"Vincent Lussier","offers":[{"title":"Default Title","offer_id":49632670515492,"sku":"","price":7500.0,"currency_code":"CAD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0890\/1518\/9796\/files\/GemsMontreal_Thriveminiature_VincentLussier_ArseniKhamzin_LR06.jpg?v=1749672648"},{"product_id":"dianeroeeditions","title":"Diane's Editions","description":"\u003ch2\u003eModern Contemporary Wall Art – Limited Edition Fine Art Print\u003c\/h2\u003e\n\u003cp\u003e\"Diane's Editions \" by Quebec-based artist Diane Roe is a \u003cspan\u003e\u003cem\u003e\u003cstrong\u003elimited edition fine art print \u003c\/strong\u003eseries.\u003c\/em\u003e\u003c\/span\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cspan\u003eThis \u003cem\u003e\u003cstrong\u003emodern contemporary wall art\u003c\/strong\u003e\u003c\/em\u003e is produced as an archival pigment art print on 220 gsm paper, ensuring museum-quality durability. With its unique composition and abstract influences, ideal for collectors seeking \u003cem\u003e\u003cstrong\u003eCanadian art prints\u003c\/strong\u003e\u003c\/em\u003e that blend meaning and aesthetics.\u003c\/span\u003e\u003c\/p\u003e","brand":"Diane Roe","offers":[{"title":"SLR","offer_id":51534958330148,"sku":null,"price":250.0,"currency_code":"CAD","in_stock":true},{"title":"Habel","offer_id":51534958297380,"sku":null,"price":250.0,"currency_code":"CAD","in_stock":true},{"title":"Transfert","offer_id":51534958264612,"sku":null,"price":250.0,"currency_code":"CAD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0890\/1518\/9796\/files\/33-GemsMontreal_SLREdition_DianeRoe_ArseniKhamzin_LR.jpg?v=1753318175"},{"product_id":"clustersseries","title":"The CLUSTERS series","description":"\u003ch2\u003eModern Contemporary Wall Art – Limited Edition Fine Art Print\u003c\/h2\u003e\n\u003cp\u003eCLUSTERS is a photographic series by presemted as a  \u003cem\u003e\u003cstrong\u003elimited edition fine art print.\u003c\/strong\u003e\u003c\/em\u003e An artist duo drawn to places marked by time and human presence. These spaces, quiet witnesses to lives once lived, carry a raw emotional charge. Since 2020, the duo has been carefully staging such locations, freezing fleeting moments and preserving a world on the edge of disappearance, before modernity wipes it away.\u003c\/p\u003e\n\u003cp\u003eTheir process begins with wandering and discovery. In forgotten buildings, worn interiors, and abandoned objects, the artist duo imagines the everyday lives that once unfolded there. From these traces, they construct scenes where characters seem caught mid-gesture, as if the camera arrived by chance. The resulting images tell intimate, understated stories, far removed from spectacle, reflecting a simple yet deeply meaningful way of life.\u003c\/p\u003e\n\u003cp\u003eEach photograph is approached like a short film. Location scouting, casting, costumes, lighting, a small crew, set construction, and an intensive post-production phase all play a role in the making of each image. The technical process is demanding and precise: every final photograph is composed of roughly sixty individual shots, captured with a 150-megapixel sensor, allowing for an exceptional level of detail and clarity.\u003c\/p\u003e\n\u003cp\u003eAt its core, Clusters reflects on the memory of places and the fragile tension between what remains and what disappears. Moving fluidly between photography and cinema, the artist duo’s practice captures the fleeting presence of the human figure within spaces in transition, holding onto what quietly endures as time moves on.\u003c\/p\u003e\n\u003cp\u003eThis \u003cem\u003e\u003cstrong\u003emodern contemporary wall art\u003c\/strong\u003e\u003c\/em\u003e is produced as an archival pigment art print on 305 gsm paper, ensuring museum-quality durability. With its unique composition and abstract influences, ideal for collectors seeking \u003cem\u003e\u003cstrong\u003eCanadian art prints\u003c\/strong\u003e\u003c\/em\u003e that blend meaning and aesthetics.\u003c\/p\u003e","brand":"André Turpin \u0026 Léa Valérie Letourneau","offers":[{"title":"Fin de session \/ 15 x 20 in","offer_id":51024505405732,"sku":null,"price":330.0,"currency_code":"CAD","in_stock":true},{"title":"Fin de session \/ 18 x 24 in","offer_id":51024505438500,"sku":null,"price":370.0,"currency_code":"CAD","in_stock":true},{"title":"Lieu de commerce \/ 15 x 20 in","offer_id":51538667798820,"sku":null,"price":330.0,"currency_code":"CAD","in_stock":true},{"title":"Lieu de commerce \/ 18 x 24 in","offer_id":51538667864356,"sku":null,"price":370.0,"currency_code":"CAD","in_stock":true},{"title":"Sous-sol à Sainte-Julie \/ 15 x 20 in","offer_id":51538667831588,"sku":null,"price":330.0,"currency_code":"CAD","in_stock":true},{"title":"Sous-sol à Sainte-Julie \/ 18 x 24 in","offer_id":51538667897124,"sku":null,"price":370.0,"currency_code":"CAD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0890\/1518\/9796\/files\/GEMS_Montreal_fin_de_session_Clusters_image.jpg?v=1756775478"},{"product_id":"charless-artwork","title":"Carmine","description":"\u003ch2\u003eModern Contemporary Wall Art – Limited Edition Fine Art Print\u003c\/h2\u003e\n\u003cp\u003e\u003cspan\u003e\"Carmine\" by Montreal-based artist Charles Paradis is a \u003cem\u003e\u003cstrong\u003elimited edition fine art print\u003c\/strong\u003e\u003c\/em\u003e exploring the artist's vision rooted in vivid childhood recollections, particularly in visiting unfamiliar spaces such as homes, public places, and natural landscapes.\u003c\/span\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cspan\u003eThis \u003cem\u003e\u003cstrong\u003emodern contemporary wall art\u003c\/strong\u003e\u003c\/em\u003e is produced as an archival pigment art print on 250 gsm paper, ensuring museum-quality durability. With its unique composition and abstract influences, ideal for collectors seeking \u003cem\u003e\u003cstrong\u003eCanadian art prints\u003c\/strong\u003e\u003c\/em\u003e that blend meaning and aesthetics.\u003c\/span\u003e\u003c\/p\u003e","brand":"Charles Paradis","offers":[{"title":"Default Title","offer_id":51024703979812,"sku":null,"price":300.0,"currency_code":"CAD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0890\/1518\/9796\/files\/GEMS_Montreal_Charles_paradis_Carmine_Print_Edition_LR04.jpg?v=1761059932"},{"product_id":"laurences-print","title":"The Fourth Flight","description":"\u003ch2\u003eModern Contemporary Wall Art – Limited Edition Fine Art Print\u003c\/h2\u003e\n\u003cp\u003e\u003cspan\u003e\"The Fourth Flight\" by Montreal-based artist Laurence Thériault-Lainé is a \u003cem\u003e\u003cstrong\u003elimited edition fine art print\u003c\/strong\u003e\u003c\/em\u003e exploring  dreamlike landscape evoked by popular allegorical and fantastical symbols.\u003c\/span\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cspan\u003eThis \u003cem\u003e\u003cstrong\u003emodern contemporary wall art\u003c\/strong\u003e\u003c\/em\u003e is produced as an archival pigment art print on 250 gsm paper, ensuring museum-quality durability. With its unique composition and abstract influences, ideal for collectors seeking \u003cem\u003e\u003cstrong\u003eCanadian art prints\u003c\/strong\u003e\u003c\/em\u003e that blend meaning and aesthetics.\u003c\/span\u003e\u003c\/p\u003e","brand":"Laurence Thériault-Lainé","offers":[{"title":"Default Title","offer_id":51205647728932,"sku":null,"price":250.0,"currency_code":"CAD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0890\/1518\/9796\/files\/GEMS_Montreal_Laurence_Theriault-Laine_Print_Edition_LR01.jpg?v=1761082614"}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0890\/1518\/9796\/collections\/48-Gems_Montreal_Print_editions_ArseniKhamzin_LR_-_Copy.jpg?v=1765465071","url":"https:\/\/www.gemsprojects.com\/collections\/prints-editions.oembed","provider":"GEMS","version":"1.0","type":"link"}