{"title":"Originals","description":"\u003ch2\u003eExplore Authentic Original Art by Canadian Artists\u003c\/h2\u003e\n\u003cp\u003eThe Originals Collection at GEMS Montréal celebrates the essence of \u003cem\u003e\u003cstrong\u003efine art\u003c\/strong\u003e\u003c\/em\u003e through authentic, one-of-a-kind works by \u003cem\u003e\u003cstrong\u003eCanadian creators\u003c\/strong\u003e\u003c\/em\u003e. Each painting, drawing, or mixed-media piece is hand-made, signed, and certified, capturing the artist’s true vision and emotion with lasting integrity.\u003c\/p\u003e\n\u003cp\u003eUnlike reproductions, \u003cem\u003e\u003cstrong\u003eoriginal artworks\u003c\/strong\u003e\u003c\/em\u003e carry the presence and energy of the creator, making every piece a singular expression of creativity and culture. Curated for both seasoned collectors and first-time buyers, these exclusive works offer individuality, craftsmanship, and meaning — a timeless reflection of contemporary\u003cem\u003e\u003cstrong\u003e Canadian art\u003c\/strong\u003e\u003c\/em\u003e.\u003c\/p\u003e","products":[{"product_id":"isolees","title":"[Isolé-e-s]","description":"\u003ch2\u003e\u003cspan\u003eContemporary Art – Abstract Art Sculptures\u003c\/span\u003e\u003c\/h2\u003e\n\u003cp\u003e\"Isolé.e.s\" by Jeremy Paguet—an innovative acrylic and styrofoam artwork exploring confinement, materiality, and identity. \"Isolé.e.s\" stands as an expressive example of \u003cstrong\u003eabstract art sculptures\u003c\/strong\u003e, blending innovation with tradition.\u003c\/p\u003e\n\u003cp\u003eThis collectible piece is part of our \u003cstrong\u003eCanadian art for sale\u003c\/strong\u003e, offering discerning collectors an opportunity to acquire original art pieces that reflect both craftsmanship and contemporary vision.\u003c\/p\u003e","brand":"Jérémy Paguet","offers":[{"title":"Default Title","offer_id":49631509676324,"sku":"","price":4000.0,"currency_code":"CAD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0890\/1518\/9796\/files\/GemsMontreal_Isolees_JeremyPaguet_ArseniKhamzin_LR12_d53ca11e-fee5-47ef-b2cc-9753e9c88274.jpg?v=1749673312"},{"product_id":"quarantine2-mixed-media-paper-collage-art","title":"Quarantine2","description":"\u003ch2\u003e\u003cspan\u003eCollage Art – Mixed Media and Paper Collage Artwork for Sale\u003c\/span\u003e\u003c\/h2\u003e\n\u003cp\u003eQuarantine2 was conceived during the pandemic, a time marked by profound uncertainty and reflection. As the world faced isolation and disruption, it prompted a deep examination of our daily lives and inner selves. The constraints of confinement revealed the boundaries of our physical and emotional spaces, leading to a reconsideration of what it means to connect with others and with oneself.\u003c\/p\u003e\n\u003cp\u003eThis unique piece is a powerful example of\u003cstrong\u003e collage art\u003c\/strong\u003e, created through mixed media techniques that blend textures, fragments, and imagery. Using the approach of paper collage art, Jérémy Paguet transforms ordinary materials into a striking composition that conveys both fragility and resilience.\u003c\/p\u003e\n\u003cp\u003eAs part of our \u003cstrong\u003eCanadian art for sale\u003c\/strong\u003e, \u003cem\u003eQuarantine2\u003c\/em\u003e is more than just an image – it is a contemporary exploration of collective memory and personal introspection, making it a \u003cstrong\u003ehighly collectible piece of original collage art\u003c\/strong\u003e for discerning collectors.\u003c\/p\u003e\n\u003cp\u003e \u003c\/p\u003e","brand":"Jérémy Paguet","offers":[{"title":"Default Title","offer_id":49632667238692,"sku":"","price":3000.0,"currency_code":"CAD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0890\/1518\/9796\/files\/GemsMontreal_Quarantine2_JeremyPaguet_ArseniKhamzin_LR32.jpg?v=1749672938"},{"product_id":"bonne-annee","title":"Bonne année","description":"\u003ch2\u003e\u003cspan\u003eContemporary Art – Abstract Art for sale\u003c\/span\u003e\u003c\/h2\u003e\n\u003cp\u003e\u003cspan\u003e\u003cstrong\u003eContemporary artwork\u003c\/strong\u003e by Quebec-based artist Jeremy Paguet. Discover emerging quebec and canadian's artists online.\u003c\/span\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cspan\u003eThis work embodies the spirit of \u003cstrong\u003econtemporary abstract art\u003c\/strong\u003e, making it both a striking piece of \u003cstrong\u003eabstract wall art\u003c\/strong\u003e and a collectible for those seeking original paintings for sale. Available as part of \u003cstrong\u003eCanadian art sale \u003c\/strong\u003ecollection.\u003c\/span\u003e\u003c\/p\u003e","brand":"Jérémy Paguet","offers":[{"title":"Default Title","offer_id":49633397702948,"sku":"","price":2000.0,"currency_code":"CAD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0890\/1518\/9796\/files\/Gemsmontreal_Bonneannee_JeremyPaguet_ArseniKhamzin_LR29.jpg?v=1749672534"},{"product_id":"identity-space","title":"Identity (space)","description":"\u003ch2\u003e\u003cspan\u003eContemporary Art drawing – Original Artwork\u003c\/span\u003e\u003c\/h2\u003e\n\u003cp\u003e\u003cspan\u003e\"Identity Space\" is a \u003cstrong\u003econtemporary art drawing \u003c\/strong\u003eby Quebec-based artist Ali Khanafer that explores identity through emotion and time. Discover exclusive \u003cstrong\u003econtemporary art\u003c\/strong\u003e at Gems Montreal.\u003c\/span\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cspan\u003eAli Khanafer is a montreal-based \u003cstrong\u003econtemporary Artist\u003c\/strong\u003e whose work embodies the spirit of \u003cstrong\u003econtemporary abstract art,\u003c\/strong\u003e making it both a striking piece of \u003cstrong\u003eabstract wall art\u003c\/strong\u003e and a collectible for those seeking original paintings for sale. Available as part of our \u003cstrong\u003eCanadian art for sale\u003c\/strong\u003e collection.\u003c\/span\u003e\u003c\/p\u003e","brand":"Ali Khanafer","offers":[{"title":"Default Title","offer_id":49873834836260,"sku":"","price":1500.0,"currency_code":"CAD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0890\/1518\/9796\/files\/Gemsmontreal_EraSpace_AliKhanafer_ArseniKhamzin_LR.jpg?v=1749670831"},{"product_id":"habel","title":"Habel","description":"\u003ch2\u003e\u003cspan\u003eContemporary Abstract Art Painting – Original Artwork\u003c\/span\u003e\u003c\/h2\u003e\n\u003cp\u003e\u003cspan\u003e\"Habel\" by Quebec-based artist Diane Roe explore the the mountainous landscapes of Quebec and the forests. Collect art Online at Gems Montreal.\u003c\/span\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cspan\u003eThis \u003cstrong\u003eunique abstract art painting\u003c\/strong\u003e references the mountainous landscapes of Quebec and the forests that have been cleared to create habitable spaces, illustrating the transformation of the Quebec territory from past to present. This work embodies the spirit of \u003cstrong\u003econtemporary abstract paintings\u003c\/strong\u003e, making it both a striking piece of \u003cstrong\u003eabstract wall art\u003c\/strong\u003e and a collectible for those seeking original paintings for sale. Available as part of our \u003cstrong\u003eCanadian art for sale\u003c\/strong\u003e collection.\u003c\/span\u003e\u003c\/p\u003e","brand":"Diane Roe","offers":[{"title":"Default Title","offer_id":50403759030564,"sku":"","price":2500.0,"currency_code":"CAD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0890\/1518\/9796\/files\/Gemsmontreal_DianeRoe_Habel_ArseniKhamzin_LR.jpg?v=1749670384"},{"product_id":"transfert","title":"Transfert","description":"\u003ch2\u003e\u003cspan\u003eContemporary Abstract Art Painting – Original Artwork\u003c\/span\u003e\u003c\/h2\u003e\n\u003cp\u003e\u003cspan\u003e\"Transfert\" by Quebec-based artist Diane Roe is a \u003cstrong\u003econtemporary painting\u003c\/strong\u003e exploring the  reality of our melting glaciers in northen America.\u003c\/span\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cspan\u003eAs a \u003cstrong\u003eunique abstract art painting,\u003c\/strong\u003e Transfert captures the stark reality of our melting glaciers, gradually becoming mere ghosts of our northern landscapes. Through a harmonious interplay of organic and geometric forms, vibrant colors, and dynamic textures, the artist immerses us in a contemporary Arctic scene. Shades of blue, green, and pink convey both the beauty and the fragility of this ever-changing environment. This work embodies the spirit of \u003cstrong\u003econtemporary abstract paintings\u003c\/strong\u003e, making it both a striking piece of \u003cstrong\u003eabstract wall art\u003c\/strong\u003e and a collectible for those seeking original paintings for sale. Available as part of our \u003cstrong\u003eCanadian art for sale\u003c\/strong\u003e collection.\u003c\/span\u003e\u003c\/p\u003e","brand":"Diane Roe","offers":[{"title":"Default Title","offer_id":50421702623524,"sku":null,"price":1500.0,"currency_code":"CAD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0890\/1518\/9796\/files\/Gemsmontreal_DianeRoe_transfert_ArseniKhamzin_LR.jpg?v=1749670725"}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0890\/1518\/9796\/collections\/Gemsgalerie_DianeRoe_transfert_ArseniKhamzin_LR.jpg?v=1762458414","url":"https:\/\/www.gemsprojects.com\/collections\/gems-originals.oembed","provider":"GEMS","version":"1.0","type":"link"}